Trenching, Retaining Walls, Open cuts/batters
Piles Foundations, Pad Foundations, Site Cabins, Piling Mats, Haulage Roads.
Mobile Crane Outriggers, Tower Crane Bases, Tandem Lifts, Tracked Plant.
Double Sided Wall Formwork, Single Sided Wall Formwork, Soffit Formwork, Backpropping Floors, Profiled Steel Flooring, Early Strike Times for Formwork, Stability of Reinforcement Cage.
Temporary Bracing/Support.
Stability of Masonry Walls, Façade Retention.
Complete demolition, Part removal of load bearing members, Modification i.e. new window openings, Demolition Crash Deck
Free Standing Access Tower, Hoists, MEWP's, Edge Protection.
Solid Hoardings, Fencing with open mesh.
Pipe Testing, Thrust Block/Propping.
Temporary Pedestrian Bridge, Temporary Vehicular Bridge.

At HFLT Construction and Consultants Limited, our in house design team work with our clients to ensure the most efficient and safe solution for their project.